Pioneer Bridge

Pioneer Bridge, Singapore, was completed in 1970 and upgraded by Land Transport Authority Singapore in 2000/2001. It carries heavy industrial traffic to and from Jurong Port and is rated to carry vehicles of 44 tonnes. Modal testing and short term strain/vibration monitoring was conducted before and after the upgrade to test the need for and effect of the upgrade.

Download information (pdf format)

Interesting findings (members only)